|
المرحلة الرابعة لسنة 2014-2015- فرع هندسة النفط |
Semester I |
Semester II |
||||||||||
Subject Symbol |
Subject |
Hour / Week |
Unit |
Subject Symbol |
Subject |
Hour / Week |
Unit |
||||
Theoretical |
Practical |
Tutorial |
Theoretical |
Practical |
Tutorial |
||||||
PE441 |
Petroleum Reservoir Engineering |
3 |
|
1 |
3 |
PE446 |
Horizontal Drilling |
3 |
2 |
1 |
4 |
PE442 |
Drilling Problems |
3 |
|
1 |
3 |
PE443 |
Engineering Project |
2 |
|
|
2 |
PE443 |
Engineering Project |
2 |
|
|
2 |
PE447 |
Well Monitoring and Workover |
2 |
|
1 |
2 |
PE444 |
Well Testing |
2 |
|
1 |
2 |
PE432 |
Engineering Management |
2 |
|
|
2 |
PE445 |
Integrated Field Development and Management I
|
2 |
|
1 |
2 |
PE448 |
Integrated Field Development and Management II |
2 |
|
1 |
2 |
PE431 |
Engineering Ethics |
2 |
|
|
2 |
PE433 |
Hazards and Safety |
2 |
|
|
2 |
PE44D1 |
Subsurface Production Equipments |
2 |
2 |
|
3 |
PE44D3 |
Drilling Simulation |
2 |
2 |
|
3 |
PE44R1 |
Natural Gas Engineering |
(3) |
|
(1) |
PE44R3 |
Reservoir Simulation |
(2) |
(2) |
|
||
PE44D2 |
Advanced Topics in Drilling |
2 |
|
|
2 |
PE449 |
Risk Analysis |
2 |
|
|
2 |
PE44R2 |
Enhanced Oil Recovery |
(2) |
|
|
PE4410 |
Custody Transfer |
(2) |
|
|
||
Total |
18 |
2 |
4 |
19 |
|
Total |
17 |
4 |
3 |
19 |
|
(19) |
|
(5) |
(17) |
(4) |
(3) |
||||||
Total Hr/Week |
24 |
|
|
Total Hr/Week |
24 |
|
|||||
Total Units |
38 |